Railings (Architectural Consultant Drawings)
(Brac University, 2019-12-02) -
Rain water master pit detail at main entry
(Brac University, 2019-04-20) -
Ramp (Architectural As Built Drawings)
(Brac University, 2023-07-01) -
Rate analysis for guide wall dismantling work of BRAC University new campus project
(Brac University, 2018-04-23) -
The rate of overhead expense and profit of the additional work
(Brac University, 2018-06-28) -
Re-instrumentation and monitoring
(Brac University, 2018-11-01) -
Re-organizing the present site management team of the Contractor BUCG-ABC JV in the BRAC University new campus project
(Brac University, 2020-10-10) -
Re-rectification of D-wall
(Brac University, 2018-10-30) -
Re-submission of construction schedule for the next three month (July-September 2019) based on actual work progress
(Brac University, 2019-05-13) -
Re-submit the evaluation for additional work of waterproofing
(Brac University, 2018-05-06) -
Re: Accident or injury to the workmen
(Brac University, 2020-02-06) -
Re: All the M&E design immediately to be reviewed by the Transsolar
(Brac University, 2020-06-12) -
Re: Appointing an architectural coordinator to fulfill the obligations under conditions of contract sub-clause 8.1 & 15.1
(Brac University, 2020-02-04) -
Re: Clarification about scope of intumescent paint
(Brac University, 2020-03-07) -
Re: Clarification about scope of intumescent paint
(Brac University, 2020-03-01) -
Re: Completing all the M&E design immediately to be reviewed by Transsolar
(Brac University, 2020-06-15) -
Re: Consequences of a public works project refers to BRACU-NCP-2019-114A
(Brac University, 2020-10-04) -
Re: Contractor's All Risk insurance
(Brac University, 2020-08-08) -
Re: Defects and deficiencies in the works
(Brac University, 2020-03-07) -
Re: Finishing schedule