Browsing Brac University New Campus Development Project by Title
Now showing items 779-798 of 2622
-
IFC drawing queries
(Brac University, 2019-01-31) -
Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
(Brac University, 2022-07-05) -
The impact of failure to perform the design contract of BRAC University new campus project
(Brac University, 2021-04-22) -
Improvement of work standard
(Brac University, 2018-05-30) -
Incident of cable theft of BRAC University new campus project
(Brac University, 2022-02-10) -
Index of plumbing & sanitary drawing
(Brac University, 2019-04-20) -
Infill material in the sunken area (CM4 locations)
(Brac University, 2021-10-25) -
Initial observation on price offer for facade work (variation order #031)
(Brac University, 2020-06-20) -
Initial observation on the BMS system design drawings and BOQ
(Brac University, 2020-03-02) -
Inquiry Llst for extra works
(Brac University, 2019-05-26) -
Installation of 2nd deep tube-well at BRACU new campus project
(Brac University, 2020-08-25) -
Installation of 2nd deep tube-well at BracU new campus project site
(Brac University, 2019-10-21) -
Installation of 2nd deep tube-well at BracU new campus project site
(Brac University, 2019-12-31) -
Installation of 2nd deep tube-well works
(Brac University, 2020-08-29) -
Installation of deep tube well by the contractor of BRAC University new campus project
(Brac University, 2018-05-16) -
Installing the building monitoring device
(Brac University, 2018-12-20) -
Installing the building monitoring device
(Brac University, 2018-12-20) -
Instruction about R5 railing and updating architectural and structural drawing
(Brac University, 2022-08-07) -
Instruction for commencement of brick works at toilet zone area of all floors
(Brac University, 2021-09-06)