Browsing Brac University New Campus Development Project by Title
Now showing items 771-790 of 2622
-
Hanger elevation_Rev A
(Brac University, 2023-02-06) -
Hanger plan- part 1~part 6_Rev A
(Brac University, 2023-02-06) -
Hardware sample for glazing work (RFA-021_Rev A)
(Brac University, 2022-05-09) -
Hardware sample for glazing work (RFA-021_Rev A)
(Brac University, 2022-05-09) -
Health and safety guidelines for all the workers of all BRACU sub-contractors
(Brac University, 2021-12-19) -
HVAC drawing of BRAC University New Campus Project for RAJUK
(BRAC University, 2023-08-10) -
HVAC drawings
(Brac University, 2019-07-25) -
HVAC drawings - ventilation
(Brac University, 2019-07-25) -
IFC drawing queries
(Brac University, 2019-01-31) -
Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
(Brac University, 2022-07-05) -
The impact of failure to perform the design contract of BRAC University new campus project
(Brac University, 2021-04-22) -
Improvement of work standard
(Brac University, 2018-05-30) -
Incident of cable theft of BRAC University new campus project
(Brac University, 2022-02-10) -
Index of plumbing & sanitary drawing
(Brac University, 2019-04-20) -
Infill material in the sunken area (CM4 locations)
(Brac University, 2021-10-25) -
Initial observation on price offer for facade work (variation order #031)
(Brac University, 2020-06-20) -
Initial observation on the BMS system design drawings and BOQ
(Brac University, 2020-03-02) -
Inquiry Llst for extra works
(Brac University, 2019-05-26) -
Installation of 2nd deep tube-well at BRACU new campus project
(Brac University, 2020-08-25)