Search
Now showing items 1-8 of 8
Reasons for RDP VO dissolution: a case study on five selected VOs
(BRAC, 1997-12)
During preparatory work for the Second Impact Assessment Study (lAS -ll) in 1996,
it was found that 18 VOs (8 women and 10 men) were not functioning out of 150 which were
studied for the lAS -I. As BRAC wanted the VOs ...
Impact of Oxbow Lakes Project II on participant households
(BRAC, 1997-04)
The Oxbow Lakes Small Scale Fishermen Development Project Phase II (OLP-11) is being
financed jointly by International Fund for Agricultural Development (IF AD), Danish International
Development Assistance (DANIDA), World ...
Report of the baseline survey of potential erosion and flood affected areas of Jamuna Multipurpose Bridge Project
(BRAC, 1997-04)
This is a reoort on the baseline survey of the households within the area demarcated by the Jamuna
Multipurpose Bridge Authority (JMBA). This area spreads over 12 km to the north and 10 km to the south
of the bridge. ...
BRAC's pilot savings project of RDP: monitoring and evaluation
(BRAC, 1997-04)
During July and August of 1996, the BRAC Rural Development Programme (RDP)
initiated a Pilot Savings Project (PSP), whereby three experimental savings systems were
implemented in various areas of Bangladesh, with a ...
BRAC's pilot savings project: status reports
(BRAC, 1997-11)
Poverty alleviation of the hard core poor in Bangladesh
(BRAC, 1997-11)
BRAC launched IGVGD Programme to improve the condition of the poorest women covered
by Vulnerable Groups Development (VGO) Programme. In this context high yielding variety
(HYV) poultry birds rearing was introduced as ...