Approval of VO#042 for additional component in plumbing works
(Brac University, 2021-06-04)
The engineer's observation and instruction regarding the concreting works at utility portion
(Brac University, 2019-07-27)
Completing modification in beams, slabs for escalator installation
(Brac University, 2021-11-07)
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
(Brac University, 2022-05-16)
VO #017 Valuation of light protection connected to underground system of BRAC University new campus project
(Brac University, 2019-10-06)
VO#001 Approval of unit rates for additional steel work for SF01-15 as non-schedule item
(Brac University, 2021-06-06)
Regarding transporting the steel structure of zone C outside the project
(Brac University, 2021-01-12)
The engineer’s Instruction for rectification of opening for escalator in grid ‘X, 19-20 & W, 19-20’ of B1 to B1 (A-)
(Brac University, 2019-10-20)
VO#043 Approval of the cost for supplying the material components of internal electrification works
(Brac University, 2022-05-24)
Instruction to commence the steel & civil works