Browsing by Subject "BoQ"
Now showing items 1-10 of 10
-
The engineer’s instruction to postpone the boundary wall work under section 7 of BOQ at BRACU new campus project
(Brac University, 2020-12-08) -
Initial observation on the BMS system design drawings and BOQ
(Brac University, 2020-03-02) -
Observation on the electrical design drawings and BoQ
(Brac University, 2020-01-14) -
Offer to do the fire protection coating at increased quantity of BOQ item no.10.2
(Brac University, 2020-12-03) -
Request to release balance amount under BOQ 3.6
(Brac University, 2019-05-26) -
Submitting final design, drawing and BOQ of facade immediately
(Brac University, 2020-03-01) -
Submitting Final design, drawing and BOQ of facade within 20.02.2020
(Brac University, 2020-02-13) -
Toilet partition works [BOQ item no. 8.1.12]
(Brac University, 2020-06-13) -
Use of BRACU supplied cement and rebar in the work other than BOQ item no. 5.1, 7.1.2, 7.2.5.and 5.2, 7.1.4, 7.2.6
(Brac University, 2022-05-16)