Browsing by Subject "BBT system"
Now showing items 1-6 of 6
-
Instruction to start the work at BRACU new campus project (BBT system)
(Brac University, 2021-11-16) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020
(Brac University, 2020-12-12) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of July 4, 2020
(Brac University, 2020-07-04) -
Punches in the walls and slabs are being kept as per submitted drawing
(Brac University, 2021-12-11) -
Re: Observation on the electrical design drawings and BOQ
(Brac University, 2020-01-19)