• Login
    • Library Home
    View Item 
    •   BracU IR
    • Brac Institute of Governance and Development (BIGD)
    • Masters in Procurement and Supply Management (MPSM) Program
    • Dissertation (Masters in Procurement and Supply Management)
    • View Item
    •   BracU IR
    • Brac Institute of Governance and Development (BIGD)
    • Masters in Procurement and Supply Management (MPSM) Program
    • Dissertation (Masters in Procurement and Supply Management)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Role of maintenance management of rolling stock in Bangladesh Railway : a study to assess effectiveness and efficiency

    Thumbnail
    View/Open
    14282014.pdf (830.2Kb)
    Date
    2015-02
    Publisher
    BRAC University
    Author
    Islam, Md. Shafiqul
    Metadata
    Show full item record
    URI
    http://hdl.handle.net/10361/4915
    Abstract
    There is no denying to the fact that the safety and reliability of railway transportation system largely depends on efficient maintenance of rolling stock or whatsoever. Such goal needs a scientific and efficient maintenance management. Bangladesh Railway owns a big fleet of rolling stock, sophisticated and conventional and a vast organization is at work round the clock to look after them for optimum utility and efficient service for its users, for this reason proper maintenance is necessary. The main objective of this study is to identify the efficiency and effectiveness of maintenance management of rolling stock and its impact on railway operation. The investigation particularly included determining the existing performance of maintenance and productivity of the management which is related to the rolling stock maintenance and also the scope of maintenance management enrichment. Mainly Data was collected from secondary sources from various monthly reports prepared by mechanical and stores department, statistical Information Book 2013 of Bangladesh Railway etc. Text books, Reference books, published journals, articles, Carriage & Wagon manual, loco shed manual, Workshop manual are studied. Primary data are collected by interviewing employees, shop and depot in-charges, from the seniors, retired and knowledgeable persons and railway officials who are conversant with the maintenance management of rolling stock Bangladesh Railway. Some primary data collected through observation and from secondary maintenance management for assessing efficiency and effectiveness of maintenance management. BR is a state owned service provider. It provides safe, comfortable and economic transport services to the passengers and thus government is paying Public Service Obligatory (PSO) grant. The losses and declining operational performance is closely related with efficient and effective maintenance management of rolling stock. It is true that the practice of maintenance management in BR is so far from the modern concept of management. The author has tried to assess efficiency and effectiveness of maintenance management and to identify the constraints, weakness, and finally concluding with some VI recommendations coping up those issues with modern and current practices in maintenance management system. The area of the study covered the effectiveness and efficiency of maintenance management of rolling stock of different workshop and sheds (Pahartali, Chittagong, Dhaka, Parbatipur, Dinajpur, Saidpur) of Bangladesh Railway, which was based on primary and secondary data. After examining and assessing, it was found that existing maintenance management of rolling stock in BR is inefficient and ineffective and the subsequent impact is resulting in a decrease in the earning of BR annually. For a state owned Enterprise, the poor maintenance management can be attributed to the following causes. These are (i) Traditional maintenance system and averaged, under capacity facilities of maintenance, (ii) Inefficient and traditional HRM practice, (iii) Insufficient budget allotment, (iv) Inefficient and ineffective safety management, (v) Want of practice of modern maintenance management. For improvement of these situations, some specific recommendations have been drawn. These are (i) BR should clearly define its vision, objectives and policies and to follow modern concepts, policies & practice of maintenance management, inventory and purchasing management., (ii) BR should reorganize its manpower management with modern concept of HRM, (iii) BR should invest adequate fund for re-engineering its workshops, depots and loco sheds with modern equipment and facilities, (iv) Adequate budget should be allocated for material purchase, (v) BR should adopt the modern concept, tools and technologies in case of all related management including maintenance management.
    Keywords
    Procurement and supply management; Bangladesh Railway; BIGD; Rolling stock
     
    Description
    This dissertation report is submitted in partial fulfillment of the requirements for the degree of Masters in Procurement and Supply Management, 2015.
    Collections
    • Dissertation (Masters in Procurement and Supply Management)

    Copyright © 2008-2019 Ayesha Abed Library, Brac University 
    Contact Us | Send Feedback
     

     

    Policy Guidelines

    • BracU Policy
    • Publisher Policy

    Browse

    All of BracU Institutional RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    Copyright © 2008-2019 Ayesha Abed Library, Brac University 
    Contact Us | Send Feedback